The emissions report a regulator asks for, from the shipments themselves.
Kaiden reports Scope 3 freight from measured shipments, not a survey — and chooses lower-emission lanes at the moment of booking.

The challenge
Kaiden's Scope 3 freight figure came from a spend-based estimate and a supplier survey. Auditors asked how it was made; nobody could show the shipments behind it.
When components ran short, allocation was decided in a weekly meeting, by which time the fastest lanes were full.
What was deployed
Footprint measured every shipment to the GLEC framework from the data Transport and Visibility already held. Tier-one suppliers report through the Network, once, for every customer.
Transport now shows cost, time and emissions side by side at booking; Planning allocates scarce parts daily against the live plan.
“Our emissions number used to be an estimate we defended. Now it's a measurement we can show.”
Talk to the team behind 2,400 supply chains.
A team in your region and an implementation plan with dates.
- Americas+1 312 555 0142
- Europe, Middle East, Africa+44 20 7946 0123
- Asia Pacific+65 6555 0175





